A Professional of Cast-in-place Pile Construction Work, Shinmei Gikou and Shimei Techno

Revolving Method

HomeRevolving Method

The method maximizes its potential for hard ground.

All Casing Method The carbide bit installed onto the tip and the revolving excavation method enables the construction work free from ground collapse. And also, the high-precision verticality makes construction of large‐bore or great depth with low vibration and noise available.

Strong points Large‐bore and great depth
Low noise and low vibration
Suitable to hard ground

■Member of Super Top Association
■Member of CD Association

Revolving Method

Construction plan diagram

Construction plan diagram

Construction system drawing

Construction system drawing
Contact Us

Phone

+81-92-408-4108
Inquiry form