A Professional of Cast-in-place Pile Construction Work, Shinmei Gikou and Shimei Techno

TBH Method

Reverse-circulation method
HomeTBH Method

Capable of carrying out a pile work in a narrow or at a low altitude below the head.

By using reverse circulation method, control of slime falling is assured and slime treatment after erecting reinforcement was facilitated. Construction works with low noise and vibration was enabled. Also, by exchanging drilling bit, excavation of weathered rocks and gravel layer was enabled.

Application Cast-in-place piling
Foundation work at low altitude below the head
Foundation work at narrow spaces or the like
TBH Method

State of construction

Foundation pile works at low altitude below the head
Foundation pile works at low altitude below the head
Foundation pile works at narrow spaces
Foundation pile works at narrow spaces
Contact Us

Phone

+81-92-408-4308
Inquiry form